Product series

Contact us
Green Prototype Technology Co.,LTD.
Add:No.7,Ligang Road,Shajing Street,Baoan District, Shenzhen City,China.
Tel:0755-27290177 27290166
Fax:0755-27553336
Email:authur@green-prototype.com
Home  -  Product  -  Surface technology  -  Oxidation electrophoresis powder Oxidation electrophoresis powder
【Product name】:Electrophoresis
【Processing method】:CNC machining
【Processing materials】:metalwork
【Surface treatment】:Oxidation, electrophoresis, spraying
【Product size】: 1000*100*80mm
【Production cycle】:3-5days
Previous:No information
Next:Dusting
Product Description

The general process flow is:

Pretreatment of workpiece (in addition to oil, hot water washing, cleaning, water washing, phosphorization, hot water washing, passivation), anode electrophoresis, 

workpiece after treatment, water washing and drying).

1, in addition to oil. Solution is generally hot alkaline chemical in addition to oil, the temperature is 60 degrees (steam heating), the time is about 20min.
2, hot water wash. Temperature 60 C (steam heating), time 2min.
3, rust. With H2SO4 or HCl, such as hydrochloric acid cleaning liquid, HCl acidity is more than or equal to 43 points; free acidity greater than 41 point; cleaning agent 1.5%; room temperature wash 10 ~ 20min.
4, cold water wash. Flow in cold water wash 1min.
5, phosphating. Temperature phosphating (60 10min), phosphating solution can be used for the sale of finished goods.
The above process can also be replaced by sand blasting.
6, passivation. With the phosphating solution supporting drugs (provided by the sale of phosphate liquid), 1 ~ 2min at room temperature.

7, anodic electrophoresis. Electrolyte components: H08-1 black electrophoretic paint, solid mass fraction 12% to 9%, distilled water mass fraction 88% to 91%. Voltage: (70 + 10) 2.5min, time:

 2 ~ V, paint liquid temperature: 15 ~ 35, paint liquid PH value: 8 ~ 8.5. Pay attention to the work out of the slot to power. In the process of electrophoresis, the current increases with the film thickness.

8, water wash. Wash in cold water.
9, drying. In the oven at (165 + 5) at the temperature of 40 ~ 60min.


Keyword:深圳快速成型公司  深圳钣金加工公司  深圳激光快速成型  深圳手板制作

Copyright © 2015-2018 Green Prototype Technology Co.,LTD. All Rights Reserved.  
Add:No.7,Ligang Road,Shajing Street,Baoan District, Shenzhen City,China. Email:authur@green-prototype.com

Links:格瑞模型一呼百应网    高端耳机手板厂    深圳格瑞模型阿里巴巴旺铺    慧聪网商铺    深圳快速成型公司    深圳钣金加工公司    深圳激光快速成型    深圳手板制作